Energy Without Monsters: Distributed Energy Islands Instead of Soviet CHPs
Yurii Kasian
Automation Engineer · RFID Ukraine LLC · Kyiv
Published:
Automation Engineer · RFID Ukraine LLC · Kyiv
Published:
- I look at Kyiv's CHP-5 and CHP-6 not as power generation, but as an architectural mistake cast in concrete. A single plant delivering hundreds of megawatts of heat, trunk mains of 1200–1400 mm diameter, hundreds of kilometres of networks, dozens of pumping stations and heat substations — all of it was built for a different country, with a different demography, and without the assumption that forty years later someone would strike these pipes.
- Let us do the honest arithmetic. Kyiv's trunk heat network alone is more than 100 km of large-diameter pipe within the city limits; design heat losses are 8–12%, while measured losses on 1970s–1980s sections run at 18–25%[6]. Every degree lost per kilometre is paid for by the resident. Every trunk main failure means 8 to 30 hours of repair, with welders who in 2026 are simply not there.
- The second problem is people. A Soviet CHP plant is a 400–800 person payroll[7]: roundsmen, operators, repair crews, chemists. Not because the technology is bad, but because it was designed around manual attendance. Ukraine's demographic profile no longer supports payrolls like that — and never will again.
- The third problem is physical. One Kalibr missile into an exposed trunk main or a turbine hall, and 300,000 people lose heat. A centralised system has a built-in property: the bigger the node, the bigger the failure zone.
- In Part One ("A Country Without Hands") I set out the principle: new infrastructure must be distributed, underground and fully automated — lights-out. In energy, this translates literally: not one large plant per city, but dozens of small energy islands per district, each autonomous, buried, and run by three engineers with a laptop.
- But earlier revisions of this text assumed a seasonal heat store of 50,000 m³, geothermal without heat pumps, and a microreactor in an apartment courtyard. Checking the physics and the market showed that was romance. Below is the corrected model. Three islands, eight CHP modules, mechanical storage instead of chemical — and an honest audit of the risks.
The Technology Stack: Two Stages, No Illusions
Stage 1 (2026–2030): What Can Already Be Ordered and Installed
Geothermal Loop (EGS) and Pumps The Fervo Energy principle[10]: two parallel horizontal wells at 2.5–3 km depth in the granites of the Ukrainian Shield, connected by a multi-stage hydraulic fracture. Kyiv's geology: gradient 20–30 °C/km[8], at three kilometres — 70–90 °C. This is a low-grade source, requiring heat pumps. Two 1 MW pumps with redundancy circulate the working fluid; the loop's hydraulic resistance requires a continuous draw of 1.5 MW.
Industrial Heat Pumps Ammonia/CO₂ heat pumps, COP 4.5–5[11]. They draw 4.5 MW of electricity and lift 20 MW from EGS to 22 MW at 85–90 °C — the working temperature of a 4GDH network. Feeding 70–90 °C directly into old Soviet radiators (designed for 105–150 °C) is physically impossible. At the winter peak, the pumps are throttled to 50% (2.25 MW), heat comes from EGS + CHP, and peak fluctuations are smoothed by the PCM buffer.
Gas-Fired Combined Heat and Power (CHP) Eight 3.0 MW modules (Jenbacher J620 class[12]), N+1: seven active plus one in hot standby = 21 MW of active electrical capacity. Electrical efficiency 42–45%, up to 90% in combined heat and power mode. Heat recovery: 29 MW from seven active modules. Eight modules, not six, are what close the 21 MW peak with N+1 margin. Sited in a buried bunker, with a capital blast wall between modules.
Heat Storage: Weekly Buffer and PCM Weekly PTES buffer: 50,000 m³ at ΔT 40 K (from +90 °C down to +50 °C) = 2,322 MWh. At the island's average winter load of 17–18 MW that is ≈ 5.3–5.5 days. It is a buffer against a failure, not an inter-seasonal store (seasonal requires pits of hundreds of thousands of cubic metres, like Vojens in Denmark[13]). PCM thermal stores: 500–1,000 m³ of salts or paraffin provide 20–40 MWh of daily buffer, smoothing peaks while the heat pumps are throttled[14].
Frequency Stabilisation: Flywheels and Automation Flywheels[15]: 2 MW / 0.5 MWh. Millisecond response, 100,000+ cycles, 20+ year service life. Not for long-duration storage, but for smoothing module switching transients. Chemical batteries (Li-ion) are not needed here — they degrade in 5–7 years, while the infrastructure must last 30–50. Everything is controlled by Smart Microgrid + SCADA: autonomous balancing, fault isolation in milliseconds.
Stage 2 (2035+): A Strategic Option, Not a Recovery Baseline
- Microreactors (SMR) at industrial sites[16]. Westinghouse eVinci completed zero-power criticality tests and core tests up to 1,011 °C in 2026. These are advanced field-demonstrated technologies, but not serial commercial products ready for mass export. And most importantly: a microreactor's place is not under an apartment block[5]. After ZNPP, the psychological and regulatory barrier is too high: the regulator will demand exclusion zones and armed guards. The real sites are critical industry and data centres. The alternative to a reactor under the windows — large heat pumps on industrial waste streams and seasonal stores at city level[17].
Worked Example: Northern Troieshchyna, Kyiv
- I take a real housing estate: a footprint of ~1.2 × 1.5 km. Apartment blocks — ~60 (9–26 storeys), apartments — ~19,000, residents — 45,000–50,000. Heated floor area — ~1.5 million m² (housing plus schools, kindergartens, retail, the tram line).
- Building stock: ~65% — Soviet panel (KT, T, 96 series) with heat losses of 75–95 W/m²; ~15% — 2000s panel (APPS-Lux, KTU); ~20% — 2010s new builds with facade insulation (40–55 W/m²). That is why the weighted thermal load is 65–70 W/m² for this specific stock.
- Design peak loads (winter, −15 °C[2]): Thermal: 97–105 MW. DHW: 12–15 MW. Total: 110–120 MW. Electrical: households 27–30 MW + commercial 8–10 MW + tram traction substation 3–5 MW = 40–45 MW winter evening peak.
- Architectural decision: the estate is split into 3 independent energy islands — ~15 MW of consumers and ~37 MW of heat each. But an island consumes more than what is in the apartments — its own auxiliary loads are added: heat pumps (4.5 MW) and EGS pumps (1.5 MW). That is why the island peak is not 15 but 21 MW.
Table 1 · Configuration of one energy island — Stage 1 (2026–2030)
| Module | Configuration | Electrical | Thermal | Duty | Role in the system |
|---|---|---|---|---|---|
| EGS loop | 2–3 pairs of horizontal wells, 2.5–3 km, FRAC zone; 70–90 °C | — | 20 MW | 24/7, low-grade | Baseload heat source |
| EGS pumps | 2 × 1 MW, one standby | −1.5 MW | — | 24/7 | Coolant circulation |
| Heat pumps | NH₃/CO₂, COP 4.5–5, 50% throttling at peak | −4.5 MW (2.25 at peak) | +22 MW at 85–90 °C | 24/7, throttled at peak | Temperature lift |
| Bunker · CHP units | 8 modules × 3.0 MW, N+1 (7 + 1), blast wall | 24 MW (inst.) / 21 MW (active) | 29 MW (7 active) | Base + peaks, up to 90% eff. | Generation, hot standby |
| PTES buffer | 50,000 m³, ΔT 40 K (+90 → +50 °C) | — | 2,322 MWh (≈ 5.4 days) | Weekly cycle | Peak and failure smoothing |
| PCM store | 500–1,000 m³ salts/paraffin | — | 20–40 MWh | Daily cycle | Heating peak smoothing |
| Flywheels | 2 MW / 0.5 MWh | 2 MW (discharge) | — | Seconds–minutes | Frequency stabilisation |
| Rooftop PV | Schools, kindergartens, roofs | 3–4 MW (daytime) | — | Daytime | Daytime peak |
| Island total | EGS + HP + CHP + PTES + PCM + FW + PV, N+1 | 27–28 MW (inst.) | 49–71 MW | ≥70% survivability | Crew: 3–4 engineers |
- Thermal coverage check: at the −15 °C peak the heat pumps are throttled to 50%, so heat comes from EGS 20 MW + CHP 29 MW = 49 MW against ~37 MW demand — a 32% margin. PTES check: 50,000 m³ × 1000 kg/m³ × 4.18 kJ/(kg·K) × 40 K = 8,360 GJ = 2,322 MWh; at 17.5 MW average winter load ≈ 5.4 days.
Table 2 · Closed electrical balance of one island
| Mode | Generation | Consumption | Balance | Action |
|---|---|---|---|---|
| Winter peak, day | CHP 21 + PV 3 = 24 MW | Consumers 15 + EGS 1.5 + HP 2.25 = 18.75 MW | +5.25 MW | HP throttled, PCM charging |
| Winter peak, night | CHP 21 MW | Consumers 12 + EGS 1.5 + HP 2.25 = 15.75 MW | +5.25 MW | Surplus heat to PTES |
| Shoulder, night | CHP 15 MW (5 modules) | Consumers 6 + EGS 1.5 + HP 4.5 = 12 MW | +3 MW | HP at full, PTES charging |
| One CHP unit lost | CHP 18 (6 active) + flywheels 2 = 20 MW | Consumers 15 + EGS 1.5 + HP 2.25 = 18.75 MW | +1.25 MW | Standby module takes over |
Main correction against revision 2.0: six 2.5 MW modules (15 MW installed) did not cover the 21 MW peak once heat pumps are counted. Eight 3.0 MW modules (24 MW) close the peak with margin. Throttling the heat pumps at peak adds another 2.25 MW of headroom. This is what "closed balance" means.
Table 3 · Indicative cost of one energy island (CAPEX, 2026 estimate)
| Component | Estimate | Note |
|---|---|---|
| EGS (2–3 well pairs + pumps) | $8–12 M | excl. exploration and failed wells |
| Industrial heat pumps (22 MW) | $4–6 M | NH₃/CO₂, COP 4.5–5 |
| CHP (8 × 3.0 MW) | $9–13 M | Jenbacher J620 class |
| PTES 50,000 m³ | $3–5 M | insulated reservoir |
| PCM 500–1,000 m³ | $0.5–1 M | salts/paraffin |
| Flywheels 2 MW / 0.5 MWh | $1–2 M | frequency stabilisation |
| Rooftop PV 4 MW | $2–3 M | schools, kindergartens, roofs |
| Automation + SCADA | $1–2 M | lights-out, N+1 |
| Total per island | $29–44 M | excl. 4GDH network, land, security |
| Three islands (Troieshchyna) | $87–132 M | comparison with CHP-6 — see FAQ |
Roadmap: Practical Realism
- Stage 1 (2026–2030): 8 × 3.0 MW CHP in buried bunkers, N+1 — 21 MW baseload. EGS + industrial heat pumps, peak throttling, PCM buffer. Weekly PTES 50,000 m³ + 2 MW flywheels. Full automation (lights-out), N+1, no hundreds of people on site.
- Stage 2 (2035+): Certified microreactors (SMR) at industrial sites, not in housing. Heat pumps on industrial waste streams as an alternative to the reactor. Seasonal stores of 200,000+ m³ (inter-municipal level).
Risks and Doubts: An Honest Audit
This section is not here to weaken the text. An engineering programme that does not name its weak spots will not survive the first expert review.
Related Materials
References and Regulatory Framework
- [1] DBN V.2.6-31:2021 & DSTU B A.2.2-12:2015 (Thermal insulation and energy efficiency; Ministry of Communities and Territories Development of Ukraine) [1].
- [2] DSTU-N B V.1.1-27:2010 & DBN V.2.5-64:2012 (Building climatology and DHW load calculation) [2].
- [3] DBN V.2.5-23:2025 (Design of electrical installations with electric cookers) [3].
- [4] DBN V.2.3-18:2007 & KP Kyivpastrans (Tram/trolleybus lines and traction substation loads) [4].
- [5] State Nuclear Regulatory Inspectorate of Ukraine (SNRIU) (Nuclear facility licensing) [5].
- [6] Kyivteploenergo & Kyiv Heat Supply Scheme to 2030 (Heat network statistics) [6].
- [7] Kyivteploenergo & State Employment Service (CHP payroll and trade shortages) [7].
- [8] Atlas of Geothermal Energy Resources of Ukraine (NAS of Ukraine) [8].
- [9] Kyiv Urban Planning Cadastre (Typical building series and block boundaries) [9].
- [10] Fervo Energy (Project Red & Cape Station technical overview) [10].
- [11] Aalborg University (4GDH) & MAN Energy Solutions (District heating & heat pumps) [11].
- [12] INNIO Jenbacher Type 6 (J620) Technical Specification [12].
- [13] PlanEnergi / Vojens District Heating & IEA Energy Storage TCP [13].
- [14] IEA SHC Task 58 / ECES Annex 33 (Phase-change materials) [14].
- [15] Beacon Power & Amber Kinetics (Kinetic energy storage) [15].
- [16] Westinghouse Electric Company & Idaho National Laboratory (eVinci Microreactor) [16].
- [17] Stockholm Exergi & Helen Ltd (Industrial heat pumps) [17].
- [18] Soultz-sous-Forêts / Rittershoffen EGS & NREL Geothermal Vision Study [18].
© RFID Ukraine — international expertise in RFID automation